Manufacturing record book (MRB) index template
A ready-to-use contents register for a turnover data book — ten standard sections, 48 record lines, and columns for document number, revision, date, pages, status and location. Download it in Excel or PDF, agree it with the client before fabrication starts, and populate it as each ITP line closes.
No email required · Free for commercial use · 2 sheets
What’s in the index
Ten sections in the order most contractual data book formats expect. Delete what does not apply to the scope of supply and add discipline-specific sections — electrical, instrumentation, rotating equipment — where the specification calls for them.
General / project information
- Table of contents / index
- Scope of supply
- Contact and responsibility list
- Certificate of conformity
- Warranty / guarantee statement
Quality plans and approvals
- Project quality plan
- Inspection and test plan (ITP), approved
- Approved drawing register
- Specification and code list
- Deviation / concession register
Materials
- Material test reports (MTR / EN 10204 3.1 / 3.2)
- Heat / batch traceability record
- Material receiving inspection reports
- Consumable certificates (weld wire, flux, coating)
- Positive material identification (PMI) reports
Fabrication and welding
- Welding procedure specifications (WPS)
- Procedure qualification records (PQR)
- Welder qualification records (WQR / WPQ)
- Weld map / weld log
- Heat treatment charts and records
Inspection and NDT
- Dimensional inspection reports
- Visual inspection reports
- RT / UT / PT / MT reports
- NDT personnel qualifications
- Signed ITP with witnessed / hold points
Testing
- Hydrostatic / pneumatic test reports
- Functional / performance test reports
- Factory acceptance test (FAT) report
- Calibration certificates of test equipment
- Test punch list and close-out
Surface protection
- Surface preparation records
- Coating / painting reports (DFT, adhesion)
- Coating material data sheets
- Galvanizing certificates
Nonconformance and corrective action
- NCR register
- Closed NCRs with disposition and verification
- CAPA / corrective action records
- Concession / waiver approvals
Preservation and shipping
- Preservation procedure and records
- Packing list
- Shipping / release note
- Preservation instructions for site storage
Operations and close-out
- As-built drawings
- Installation, operation and maintenance manuals
- Spare parts list
- Regulatory / statutory certificates
- Final MRB approval and transmittal record
Three things to change first
- Match the contract index. Where the purchase order or specification dictates a section structure, that structure wins. Align the template to it before a single record is filed.
- Set the traceability rule. Every line must tie a record to a physical item — heat, weld, tag or serial number. Broken traceability is the most common reason a data book is rejected.
- Decide the sign-off authority. Name who reviews and who accepts each section, and mirror the hold and witness points already defined in the ITP.
For the full picture, read our guide to the manufacturing record book, and prepare the plan it depends on with how to prepare an ITP.
Questions about the MRB index template
What is an MRB index?
The MRB index is the controlled contents register at the front of a Manufacturing Record Book. It lists every required record by section, with its document number, revision, date and status, so a reviewer can see at a glance what evidence exists and what is still outstanding.
Is this MRB template free to use commercially?
Yes. Download it, add your own document number, revision and logo, and use it on your projects. It is a starting point rather than a controlled document — bring it under your own document control before issuing it.
What format is the MRB index template in?
An Excel (.xlsx) workbook you can edit, extend and use as a live register, plus a print-ready PDF for review meetings and field use.
How many sections should an MRB have?
There is no universal number. Ten sections covering general information, quality plans, materials, fabrication and welding, inspection and NDT, testing, surface protection, nonconformance, preservation and shipping, and close-out suit most fabricated equipment packages. The contractual index always takes precedence.
When should the MRB index be agreed?
At contract award, before fabrication begins. Agreeing the index, numbering and file format up front is the single most effective way to avoid a rejected data book at handover.
Data book holding up your milestone?
Send us the package scope and the contractual index — we'll tell you what is missing and what it takes to close the book.
